The system comes with 2 power switches namely a Main power switch and a Sub power switch.
When switching ON the power of the system, switch it ON from Main power switch .
The Power LED on the Control panel lights up orange.
The Power LED on the Control panel lights up blue.
The [MACHINE] screen that shows the warm-up process is displayed following the wake-up screen.
Warm-up takes approximately 8 minutes.
To change to the [COPY] screen, press the [COPY] tab on the screen while warm-up is displayed. If [Ready to set reserve job] is displayed on the [COPY] screen, the original is scanned during the warm-up process, and it can be output immediately when the system is ready to copy.
If a Key Counter or copy card insertion instruction is displayed, follow it to perform the appropriate operation.